Skip DEQ navigation
Skip Navigation Links Home » Major Facility Siting Program » MSTI » MSTI Application

MSTI Home  | MSTI Interactive Map with Resources Information MSTI Downloadable Maps

 

Mountain States Transmission Intertie (MSTI)

MFSA APPLICATION AND SUPPORT DOCUMENTS

All documents are PDF documents.
Download the latest version Adobe Reader free.

5th Supplemental & Replacement pages
4th Supplemental & Replacement pages
3rd Supplemental & Replacement pages
2nd Supplemental & Replacement pages
1st Supplemental & Replacement pages

VOLUME I-A  MFSA Application
Table of Contents
CHAPTER 1  Purpose, Need and Benefits
CHAPTER 2  Proposed Action and Project Alternatives
CHAPTER 3  Affected Environmental
CHAPTER 4  Environmental Consequences
CHAPTER 5  Consultation and Coordination
CHAPTER 6  List of Preparers and Contributors
CHAPTER 7  References
CHAPTER 8  Acronyms and Glossary
VOLUME I-B  Engineering, Cost and System Planning Information
Cover Page
APPENDIX A-1  ARM 17.20.811 All Facilities, Estimated Cost of Facility
APPENDIX A-2  17.20.815 Linear Facilities Estimated Annual Costs
APPENDIX A-3  MSFA Pricing Policy Affidavit Summary
APPENDIX A-4  Planning
APPENDIX A-5  Rocky Mountain Area Transmission Study (RMATS)
APPENDIX A-6  17.20.923 Electric Transmission Lines, Reliability of Service
APPENDIX A-7  17.20.924 Electric Transmission Lines, Economy Considerations
APPENDIX A-8  17.20.929 Linear Facilities, Interconnection Agreements
APPENDIX A-9  17.20.1305 Electric Transmission Lines, Criteria for Evaluation of Alternatives
VOLUME I-C
APPENDICES B-G
APPENDIX B  Environmental Protection Measures
APPENDIX C Specifically Recommended Mitigation Measures
APPENDIX D  MSTI Construction and Ground Disturbance Assumptions
APPENDIX E  Subroute Graphics and Data
APPENDIX F  Route Selection Process
APPENDIX G  Public and Agency Scoping Summary Report
VOLUME II  Technical Reports
Table of Contents
REPORT 1  Biological Resources Technical Report
REPORT 2  Water Resources and Wetland Technical Report
REPORT 3  Geology and Soils Technical Report
REPORT 5  Land Use Technical Report
REPORT 6  Visual Resources Technical Report
REPORT 7  Socioeconomics Technical Report
REPORT 9  Impact Data Tables - CDs
VOLUME IV-A  Regional Study Report
Introduction - Table of Contents
Executive Summary
CHAPTER 1  Introduction
SITING STUDY
CHAPTER 2  Study Methods
CHAPTER 3  Inventory and Sensitivity Analysis
CHAPTER 4  Alternative Corridor Identification
CHAPTER 5  Alternative and Preferred Route and Station Sites Identification
CHAPTER 6  Authorizations and Permits
PRELIMINARY ENGINEERING
CHAPTER 7  Transmission Line Design Criteria
CHAPTER 8  Conductor Study
CHAPTER 9  Structure Study
CHAPTER 10  Cost Estimates
CHAPTER 11  Future Study
CHAPTER 12  Permitting and Right-of-Way Costs
CHAPTER 13  Project Schedule
APPENDIX A  Siting Study Supplemental Data
VOLUME IV-B Regional Study Maps
EXHIBIT 1  Land Jurisdiction and Special Management Areas
EXHIBIT 2  Existing Land Use and Designated Utility Corridors
EXHIBIT 3  Visual Sensitivity
EXHIBIT 5  Sensitive Plants
EXHIBIT 6  Wildlife Resources
EXHIBIT 7  Engineering Constraints and Geohazard Sensitivity
EXHIBIT 8  Composite Sensitivity and Constraints
EXHIBIT 9  Potential Townsend and Ringling Substation Sites
EXHIBIT 10  Alternative Corridors, Routes and Substation Sites

Major Facility Siting Program                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             

MFS Program Contacts
DEQ Staff Directory
Major Facility Siting Act 
ARM Title 17- Chapter 20
MCA Title 75- Chapter 20
Circular 1
Circular 2
Environmental Assessments
Legal Notices
Application Requirements
List of Previously Analyzed Projects
Photo Gallery
Opencut Mining Program
Hard Rock Mining Program
Industrial & Energy Minerals Bureau
Environmental Management Bureau
Permitting & Compliance Division
Download the latest version of Adobe Reader