Major Facility Siting Program
- MFS Program Contacts
- DEQ Staff Directory
- Major Facility Siting Act
- ARM Title 17- Chapter 20
- MCA Title 75- Chapter 20
- Circular 1
- Circular 2
| Project Name | Applicant | Status |
|---|---|---|
|
Havre Rainbow Project : |
Western Area Power Administration (WAPA) | Pending 04/25/05 |
|
Valley County Wind Project: |
Wind Hunter, LLC | Pending 01/03/05 |
|
Montonore Project: |
Mines Management, Inc. | Pending 06/15/05 |
| Note:
Slow loading, large document containing sizeable images. Click the Bookmarks tab on the left to display the Table of Contents. |
||
| Colstrip Amendment 2 Applicant: |
PPL Montana | Completed |
| Wolf Point-Williston | Western Area Power Administration ( WAPA) | Under construction |
| Edgar & Straw On-Site Diesel Generation | Express Pipeline | No longer covered under MFSA |
| Fort Peck-Wolf Point | Western Area Power Administration ( WAPA) | construction complete |
| Townsend-Garrison 500 kV transmission line | Bonnville Power Administration (BPA) | MFSA Compliance, 6/87 & 9/82 |
| Garrison-West 500 kV transmission line | Bonnville Power Administration ( BPA) | MFSA Compliance, 5/83 & 8/83 |
| Colstrip-Townsend 500 kV transmission line | Montana Power Co. (MPC) | Certified 9/80 |
| Colstrip-Hot Springs 500 kV transmission line | Montana Power Co. (MPC) | Certified 7/76 |
| Buffalo Station amendment (pipeline and breakout tank farm) | Express Pipeline | Amendment approved September 2000. |
| Madison Missouri Federal Energy Regulatory Commission (FERC) Relicensing of nine dams on the Madison and Missouri Rivers | Montana Power Company – PPL Montana | DEQ served as lead state agency in presenting a recommendation to FERC. FERC approved the license on September 27, 2000. |
| Noxon and Cabinet Gorge dams Federal Energy Regulatory Commission (FERC) Relicensing. | Avista Corp (Formerly Washington Water Power) | DEQ served as lead state agency in presenting a state recommendation to FERC. A settlement agreement was submitted as a part of the application and FERC approved the license February 23, 2000. |
| Express Crude Oil Pipeline
(24" diameter, 305 miles in Montana) |
Alberta Express Corporation | Certified status: BER approved the project 7/26/96 and it was constructed in 1996 and 1997. |
| Noranda 230 kV transmission line | Noranda | Certificate status: DNRC approved the project 6/03/93. The transmission line was not built and the certificate has expired. |
| Great Falls – Conrad 230 kV transmission line | Western Area Power Administration | Certificate status: Board determined that line complied with substantive requirements of MFSA 9/24/84. |
| Laurel – Bridger "B"
Line |
Montana Power Company | Certificate status: DNRC approved the project 3/03/86. |
| Noxon – Pine Creek, ID 230 kV transmission line | Washington Water Power Company | Certificate status: Board ruled that the project is exempt from MFSA. Board also adopted construction and mitigation standards for project 3/9/84. |
| Central Montana (Glengarry – Judith Gap) 100 kV transmission line | Montana Power Company | Certificate status: DNRC approved the project 10/11/85. |
| Resource 89 (Salem) Coal Fired Power Plant – 350 mW | Montana Power Company | Certificate status: DNRC found MPC’s application to be deficient in certain areas and not in compliance with MFSA 5/5/83. |
| Fort Peck – Havre 230 kV transmission line | Western Area Power Administration | Certificate status: Board determined that project complied with the substantive requirements of MFSA 8/19/83 |
| Kootenai Falls Hydroelectric Project – 144 mW | Northern Lights, Inc. | Certificate status: DNRC and Northern Lights signed agreement to waive MFSA time frames on application (to await conclusion of FERC licensing process) 1/21/83. |
| Troy – Mt Vernon 115 kV transmission line | Northern Lights, Inc. | Certificate granted: 5/4/79. Centerline locations approved 9/21/79 and 6/6/80. |
| Broadview – Grass Range – Glengarry 100 kV transmission line | Montana Power Company, Fergus Electric Coop. | Certificate granted: 9/29/78. Board approved changed in certificate as proposed by applicant 10/15/79. Centerline locations approved 9/21/78. |
| Clyde Park – Dillon 161 kV transmission line | Montana Power Company | Certificate granted: 10/28/77. Centerline locations approved in 6/21/78, 8/7/81, 8/19/83, 1/20/84, and 4/13/84 |
| Wilsall – Clyde Park 161 kV transmission line | Montana Power Company | Certificate granted: 6/26/75, Board approved centerline location 12/5/75. |
| Continental Oil 100 kV transmission line | Montana Power Company | Certificate granted: 5/16/75 |
| Broadview – Alkali Creek 230 kV transmission line | Montana Power Company | Certificate granted: 1/28/77, Board approved amendment to certificate 2/23/79. |
| Anaconda – Hamilton 161 kV transmission line | Montana Power Company | Certificate granted: 10/28/77, Board approval amendment to certificate 6/5/81, centerline locations approval 8/7/81 and 1/20/84. |
| Ulm 100 kV transmission line | Montana Power Company | Certificate granted: 3/10/75, Board approval amendment to certificate 5/16/75 |
| Bridger – Roberts 50/69 kV transmission line | Beartooth Electric Cooperative | Certificate granted: 5/16/75, Board requested Applicants to submit exact centerline location – no record of a later request. |
| Circle – Flowing Well 69kV transmission line | McCone Electric Cooperative | Certificate granted: 9/13/74 |
| Colstrip 1 and 2 Associated Facilities: water supply system and 115 kV transmission line from Colstrip to pumping station | Montana Power Company, Puget Sound Power and Light Company | Certificate granted: 3/1/74 |
| Colstrip – Broadview 230 kV transmission line | Montana Power Company, Puget Sound Power and Light Company | Certificate granted: 11/15/74. Centerline approvals were granted in 1975. |
| Colstrip Units 3 and 4, and 500 kV transmission lines from Colstrip to Hot Springs | Montana Power Company (30%), Puget Sound Power and Light (25%), Portland General Electric Company (20%), Washington Water Power Company (now Avista)(15%), Pacific Power and Light Company (10%) | Certificate granted: 7/22/76. Centerline approvals for various portions of the transmission lines were granted later. |
| Laurel – Billings 100 kV transmission line | Montana Power Company | Certificate granted: 9/14/73 |
| Billings Eastside Substation 100 kV transmission line | Montana Power Company | Certificate granted: 7/20/73 |
| Anaconda – Arbiter 230 kV transmission line | Montana Power Company | Certificate granted: 7/20/73, 3/10/73 |
| Laurel – Bridger 100 | Montana Power Company | Certificate granted: 9/14/73 |
| Billings - Yellowtail 161 kV transmission line | Pacific Power and Light | Certificate granted 5/04/73 |